Such is the case for sites in rural areas that need to be linked to roads, sewer systems, and the power grid. On more complex projects, the architect may exclude or create a separate line item for site work. Therefore, it is often excluded from the building cost but identified within construction costs. Site work can significantly vary on different projects. The architect may include site work in the estimated building cost when projects have minimal site work, like projects on urban sites that are already connected to utilities and infrastructure. In some cases, site work may be included or excluded from the building costs, which are often expressed at cost per square foot. In other words, these are the costs of labor and materials. Construction costs (sometimes called “hard costs”) are costs associated with the contractor and anything the contractor purchases. When most people think about a building project, construction costs usually come to mind.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |